Free site visits & fixed written quotes  ·  020 3131 0122  ·  WhatsApp

Straight Talk

What the Trade Won't Tell You

Most of what goes wrong with a wood floor job, you only find out after you've paid. We'd rather you knew before. These are the ten things customers usually learn the hard way, taken from the complaints they write about other firms, told straight. Some of these cost us work to admit. We'd rather that than you learning one of them from us.

Home · What the Trade Won't Tell You

Truth One

A Bad Sand Hides Until the Finish Goes On


Sanding isn't one pass with a big machine. It's a graded sequence, and every grit you skip leaves marks the next one was meant to remove. The cruel part: you can't see them on bare wood. The finish goes on and suddenly there are swirls, chatter marks, dips where the machine sat. By then, putting it right costs about triple. And boards only hold so much wood; over-sand them and there's no going back.

We'll admit to being obsessive about this one. Walk a quote visit with us and we'll usually spot the sanding marks the last firm left behind, marks you've probably stopped seeing. Honestly, we're fussier about them than our clients are, and we'd rather run another pass than leave one behind. Ask any firm what their sanding sequence is. If the answer's vague, so is the floor you'll get. Ours is a three-stage process, every floor, no shortcuts.

Truth Two

"Dust-Free" Isn't a Thing


The honest number is about 95 percent. Never 100. Every floor machine we run is on industrial extraction and we clean as we go, but think about what a real job involves: lift a single floorboard and the dust from that never sees an extraction unit. Handheld machines don't plug into one. Rub something back by hand and there's dust. Stairs are hand work and genuinely dusty; we say so before every stair job.

So expect a fine film somewhere, whoever you use. The firms promising zero dust know it isn't true. We'd rather you heard it from us.

Truth Three

A Deposit Should Buy You a Place, Not a Disappearance


We take a deposit like most decent firms, and we'll tell you honestly what it's for, because nobody in this trade spells it out. It covers the materials we buy in for your job. And, being straight with you, it protects us too: you'd be surprised how often it happens the other way round, a booked day falling through on the morning, and a small firm can't refill a lost day. Above all, it buys your place in our queue. We never rush the floor we're on to get to yours, which means start dates can occasionally move. If that happens, you stay next in line, no matter what, and we agree the new date with you. Need to move it yourself? Give us a week's notice and we simply bring the job behind you forward, no fee, no fuss, and you keep your place.

Before you pay anyone a penny: look the company up at Companies House (it takes a minute and it's free), check the reviews trace back to real jobs, and never pay on a verbal quote. Our company number is at the bottom of every page of this site, and the two names on your quote are the two people sanding your floor.

And the bit we'll put in writing: if we ever had to cancel your job and couldn't offer you a date that worked, your deposit comes straight back, in full. That's not us being generous, it's your legal right, and any firm that goes quiet when you ask about it is telling you something. We never take the whole job's money upfront either: 40% secures your place, and the balance is only due when the work is done and you've walked your own floor.

Truth Four

The Quote That Grows


The classic: a keen price, work starts, then the extras appear. Subfloor, beading, board repairs, and by the end the cheap quote is the dear one. A proper quote tells you what's included, what's optional and what it costs before you say yes, not after.

Now the honest other half: sometimes a floor genuinely holds surprises. Boards under an old carpet can carry more repair than anyone could see when we quoted, and fitting a new floor can uncover a problem nobody knew was there. When that happens with us, no work is carried out and nothing is added to your bill until you've been told in full and said yes. On our quotes, optional items are printed in gold with their prices next to them, and anything unforeseen gets agreed with you before we touch it. Never invoiced after. Just know that surprises like these can add time to a job, whoever's doing it.

Truth Five

Gap Filler Moves. That's Not a Defect, It's Wood


Filler in a pine floor's gaps flexes with the boards, and after the first winter of central heating some of it can crack or fall out, whoever applied it. Nobody tells you this at quote stage. We will, because it's one of the only things in our work we don't guarantee, and that's exactly why.

It's also why we always do a site visit before quoting: seeing your floor lets us advise the filling method with the best chance of lasting, whether that's flexible filler, resin, or slivers of real wood. And some gaps are simply the character of a hundred-year-old floor, best left alone; we'll tell you which is which. There's a full honest write-up in our guide to gap filling.

Truth Six

Stained Pine Is Never One Colour, and Nobody Tells You That


Pine has an unusual grain, and stain takes light and dark within the same board. That's not patchiness and it's not a fault: it can simply appear to be different colours in different areas because of how each particular board has taken it. We stain pine evenly every time, and we still tell every customer this, because a sample pot on a website tells you nothing about your floor. We do patch tests on your actual boards, in your actual light, and set the options up overnight so you choose in daylight.

And a promise that matters more than it should have to: we will never, ever hide a sanding mark and tell you it's the wood. If your floor looks different in different areas, it's because of how the stain has taken to that board, and we'll show you the difference.

Truth Seven

The Finish Needs Time Nobody Mentions


You can usually walk on a new floor in socks the next day. But furniture goes back carefully, carried not dragged, rugs wait longer than you'd think, and the finish takes days to reach full strength. Some finishes need longer than others, and that part is chemistry, not us: we follow the manufacturers' guidelines as closely as real life allows. We put the timeline in writing with every job so nobody finds out from a scratch.

And real life is the honest bit: sometimes you simply have to be back in the room sooner than the guidelines would like. When that happens, tell us. At your request we'll carefully position the furniture back ourselves and give you the tips that give the floor its best chance through those first couple of days. Water-based finishes also smell far less than the old ones; if fumes worry you, or there's a baby or asthma in the house, ask us about them.

Truth Eight

Your Skirting Will Get Kissed


It depends on your skirting, and nobody explains this. If there's a gap under your skirting, the edging machine tucks beneath it and won't touch it at all. If the skirting sits flush to the floor, the edger runs right against it, and despite guards and all the care in the world, there's a chance it marks. We do everything we can to prevent it; an honest firm admits the chance exists.

Staining adds a second honest warning: however carefully we tape off, stain can find its way onto a skirting board, and when the tape comes off there's a chance it lifts the paint with it, especially if the skirting wasn't primed properly before it was painted. Taping or not taping, the risk never quite reaches zero. The fix for all of it is the order of works: paint your skirting after the floor is done, not before. We tell every customer this at the site visit. Most tell us nobody's ever mentioned it.

Truth Nine

The Job Takes as Long as the Drying Takes


When a "three-day job" runs into week two, it's usually because the quote ignored drying time between coats. Our day count includes it.

And here's our honest trade-off: we never rush a floor to hit the next booking, so just occasionally a start date moves. We can usually tell early on if a job's going to run over, and you hear about it the same day we do, not the night before your start date. When it's your date that moves, you stay next in the queue, no matter what.

Truth Ten

A Wet Mop Can Undo the Lot


More new finishes are killed by cleaning than by feet: soaking-wet mops, steam mops, vinegar. And it's often not the owner doing it, it's the cleaners they have in, working on the old idea that the wetter the floor, the cleaner the floor. With wood, it's the opposite. The worst case is a cleaner wet-mopping a floor that's a week old, and the sander gets the blame.

Every job of ours ends with a written aftercare guide: what to use, what never to touch, and what to tell your cleaner. The essentials live in our floor care guide, free to anyone, customer or not.

Now You Know What We Know

If you've read this far, you know more than most customers learn in three bad jobs. Use it on us or use it on someone else, but use it. And if you'd like the site visit where we say all of this about your actual floor, it's free.